Reservoir Surveillance
3 PM ANALYSIS
PRODUCTION PROFILE PREDICTOR METHOD
No risks, no intervention, lower cost, higher profit because no well shut in, higher safety, higher accuracy, higher production rates.
THE WELL TESTING REVOLUTION
- Determines actual fluid flow rates and PI from each zone of production.
- Determines gas lift valve performance in-situ
- Determines interval of each zone of production in the reservoir
- Determines the production rates of oil, gas, and water from each zone in the well with high accuracy.
- Detects thief zones
- Detects leaks in well bore
- Provides Productivity Index for each fluid at each zone
3 PM ANALYSIS
PRODUCTION PROFILE PREDICTOR METHOD
- 3 PM is a patented technology and surveillance tool that provides zonal allocation data including productivity index.
- 3 PM determines total fluid production rates of gas, oil and /or water from each zone of the well.
- 3 PM locates all open perforations in the well.
- 3 PM needs minimal data for analysis.
- 3 PM is safer because it uses surface data and no risk of loss due to downhole tools.
- 3 PM is less expensive than conventional technology.
For more information please contact us at:
info@ptssite.com | Phone: +52 (899) 995-0644


